The Right Solution for your Unique Needs
We know that every project is different, and that the selection, setup, and configuration of new products can be intimidating. Why not lean on the experts to help design and build a solution for your challenges?
Whether looking to configure the fastest micro data center, expand capacity with colocation and cloud services, or install a modular cable landing station, Vertiv offers pre-fabricated but highly-customizable solutions. Low-risk, high-value implementations have the added benefits of faster delivery and easier on-site assembly.
Customized for Your Needs
With a long-term focus on the engineering design and construction of four key sectors—data centers, medical purification, chemical and power industry, Special Application—Shenling has built a comprehensive team of industry experts. This team integrates engineering design, management, and construction, establishing Shenling’s standards for engineering excellence. As aresult, Shenling has become a large contractor specialized in providing integrated solutions for HVAC system engineering.
China Construction Engineering Luban Award.
Third- level Professional Environmental Engineering Contracting Award.
Guangdong Provincial Engineering R&D Center Certification.
Second-level Construction Engineering Contracting Qualification Certificate.
Second-level Electronic and intelligent Engineering Qualification Certificate.
First-level Construction Mechanical & Electrical Installation Qualification Certificate.
Third- level Building Mechanical & Electrical Engineering Construction Qualification Certificate.
Building information modeling (BIM) is the holistic process of creating and managing information for a built-asset. Based on an intelligent model and enabled by a cloud platform, BIM integrates structured, multi-disciplinary data to produce a digital representation of an asset across its lifecycle, from planning and design to construction and operations.
Shenling has advanced its capabilities with a dedicated assembly and prefabrication factory located in Tianjin. This facility is equipped with state-of-the-art automatic welding equipment, gas-shielded welding equipment, plasma cutting tools, and more.
Additionally, Shenling has established a specialized BIM (Building Information Modeling) team. Utilizing the parametric design capabilities of BIM technology, the 3D modeling process has significantly enhanced the optimal design, production efficiency, and engineering quality of system pipelines. This advancement not only reduces costs but also shortens construction timelines.
How doest it work?
In the early stages of project planning, Shenling utilizes advanced BIM technology to conduct comprehensive pipeline adjustments based on the design drawings. This process identifies the potential conflicts of pipeline complexities that traditional drawings cannot easily address.
Significant challenges at key points are reported to the designer for resolution. By addressing these issues before construction begins, Shenling ensures pipeline crossings and rework are avoided. This proactive approach improves the overall efficiency and quality of the project.
The primary steps in this process include:
- BIM Rervise modeling
- Clash Detection.
- Molel Splitting and prefabrication
- One Site Assembly
Rapid Design
Simplistic, repeatable, subsystem building blocks create an efficient, automated, and low-risk design process.
Tailored Integration
Complex mechanical & electrical integration activities are completed at the factory to maintain quality and velocity.
Simplistic Assembly
Clear documentation and a dedicated team of engineers enables on-site teams to assemble factory-integrated modules easily.
Global Service
A vast array of maintenance and performance services increase efficiency and reduce complexity anywhere in the world.
ICT
INTEGRATED SOLUTION EXPERT
With a long-term focus on the engineering design and construction of four key sectors—data centers, medical purification, chemical and power industry, Special Application—Shenling has built a comprehensive team of industry experts. This team integrates engineering design, management, and construction, establishing Shenling’s standards for engineering excellence. As aresult, Shenling has become a large contractor specialized in providing integrated solutions for HVAC system engineering.
HONORS AND QUALIFICATIONS
China Construction Engineering Luban Award.
Third- level Professional Environmental Engineering Contracting Award.
Guangdong Provincial Engineering R&D Center Certification.
Second-level Construction Engineering Contracting Qualification Certificate.
Second-level Electronic and intelligent Engineering Qualification Certificate.
First-level Construction Mechanical & Electrical Installation Qualification Certificate.
Third- level Building Mechanical & Electrical Engineering Construction Qualification Certificate.










BIM Technology
-Meets Shenling Expertise
Building information modeling (BIM) is the holistic process of creating and managing information for a built-asset. Based on an intelligent model and enabled by a cloud platform, BIM integrates structured, multi-disciplinary data to produce a digital representation of an asset across its lifecycle, from planning and design to construction and operations.
Shenling has advanced its capabilities with a dedicated assembly and prefabrication factory located in Tianjin. This facility is equipped with state-of-the-art automatic welding equipment, gas-shielded welding equipment, plasma cutting tools, and more.
Additionally, Shenling has established a specialized BIM (Building Information Modeling) team. Utilizing the parametric design capabilities of BIM technology, the 3D modeling process has significantly enhanced the optimal design, production efficiency, and engineering quality of system pipelines. This advancement not only reduces costs but also shortens construction timelines.
Prefabrication Modular Chiller
- Application Phases: Covers both the pre-bid and post-bid deepening phases.
- Prefabrication Scope: Includes pipelines for refrigeration stations, corridor pipelines, rooftop cooling towers, air conditioning terminals, as well as supports and hangers, with a prefabrication rate exceeding 80%.
- Application Methods: Involves the use of prefabricated pipelines, skid-mounted refrigeration stations, and containerized refrigeration stations.
- Ideal Scenarios: Particularly suitable for projects with limited construction sites, tight construction schedules, and high demands for on-site safety and environmental compliance.
Key Benefits
- Quick Deploy: Accelerate data centre construction with integration, prefabrication and flexible designs which can reach 50% increase in speed of engineering delivery.
- Safe and Reliable: Prefabricated delivery reduces the on-site installation process, saves 30~50% of the space occupied by HVAC equipment and piping.
- Low Carbon and Energy Efficiency: Minimize environmental impact and site PUE while keeping costs under control.
Worry Free Service
Timely, Considerate and Professional
· Maintenance
· Technical renovation
· Energy conservation and consumption reduction
· Original accessories
· Respond to customers’ demand within 24hours.
· lssue a service report within 5 working days
· Comprehensive service network

Project Showcases













