.ctl-bullets-container { display: block; position: fixed; right: 0; height: 100%; z-index: 1049; font-weight: normal; height: 70vh; overflow-x: hidden; overflow-y: auto; margin: 15vh auto; }
Skip to content

Shunde District Recognizes Shenling Production Base III for Exemplary Zero Energy Building

  • News

On July 8, the Shunde District Housing, Urban-Rural Development, and Water Resources Bureau commended Guangdong Shenling Environment System Co., Ltd. (Shenling) for their exceptional Zero Energy Building project, part of the China Building Energy Efficiency Association’s initiative. Shenling’s high-tech R&D building in Shunde High-Tech Park stands as the province’s only operating zero-energy building demonstration site, setting a new benchmark in building energy conservation and emission reduction.

 

 

production base III (1)

 

 

Last October, Shenling’s R&D building successfully passed the China Building Energy Efficiency Association’s seventh batch of near-zero energy building evaluations, earning certification as an operational zero-energy building. In 2023, the project was further recognized as a typical zero-energy building case, making it the only project in the province to achieve dual certification for both design and operation as a zero-energy building. This achievement also earned Shenling a provincial special fund (Urban Construction Development Green Fund) of 950,000 RMB.

 

 

energy storage
energy storage

 

 

Shenling Production Base III is a modern green factory integrating intelligent manufacturing, smart offices, and living spaces. The base actively employs user-side energy storage systems, ultra-large temperature difference water storage cooling systems, high-efficiency air conditioning equipment, photovoltaic systems, and a smart IoT environmental control platform. It has created digital artificial environment system application scenarios and built the park’s zero-energy building demonstration project to “LEED Platinum” standards.

 

 

Shenling Base III R&D Building
Previous
Next




According to calculations, Shenling’s high-tech R&D building saves 80% of annual operating costs, with a payback period for the increased investment in cold storage of just 2.85 years. Annually, it saves 6.3904 million kWh of electricity, conserves 1,961.85 tons of coal, and reduces carbon dioxide emissions by 2,415.56 tons.



Additionally, the project utilizes renewable energy, with rooftop solar panels generating approximately 5.7755 million kWh annually. This meets the project’s annual electricity demand of 1.6581 million kWh, achieving zero-energy building standards, and provides an additional 4.1174 million kWh of electricity to surrounding buildings.



Currently, the R&D building remains the province’s only operating zero-energy building demonstration site, setting a benchmark in building energy conservation and emission reduction. The project achieves intelligent energy management and operation, ensuring efficient matching of energy supply and demand by leveraging photovoltaic, energy storage, and cooling technologies for optimal energy utilization. The related technologies have broad adaptability, suitable not only for industrial parks but also for commercial and agricultural parks with high energy consumption and complex energy demand types.



Today, nearly 40% of China’s total carbon emissions come from building construction and operations. Controlling and reducing energy consumption and emissions in this sector is crucial for achieving carbon emission reduction targets. Near-zero energy buildings, which are highly energy-efficient and provide comfortable living conditions, represent a vital approach to addressing climate change and promoting energy conservation and emission reduction.




Get Quote